Full Signage Package for a 200-Unit Apartment Complex

Project Overview

Powell’s delivered a complete signage package for a 200-unit multifamily apartment complex in the Bay Area, including ADA room signs, building directories, wayfinding, parking navigation, and amenity identification. The coordinated package helped the general contractor prepare the property for final inspection on a tight construction schedule.

Project Highlights

  • More than 200 ADA-compliant room identification signs
  • Eight building directories with changeable panels
  • Parking and pedestrian wayfinding across three levels
  • One coordinated scope covering design, production, and installation
ADA-compliant all-gender restroom sign with tactile text and Braille

What Was the Signage Challenge?

The general contractor needed one signage partner who could coordinate ADA identification, directories, parking navigation, amenity signs, and installation under a single scope. Treating each item as a separate purchase would have created approval gaps and made the certificate-of-occupancy schedule harder to manage.

What Did the Multifamily Signage Package Include?

ADA Room Identification

The package included more than 200 room signs with tactile lettering, Grade 2 Braille, and the California-specific requirements applicable to permanent-room identification. Finishes were coordinated with the property’s interior palette.

Building Directories

Eight lobby directories used changeable panels so property staff could update names and destinations without replacing the complete sign system.

Parking and Pedestrian Wayfinding

The three-level parking system included level identification, directional arrows, pedestrian routes, elevator markers, and accessible parking information. Explore Powell’s wayfinding and informational signage service for related capabilities.

Amenity and Common-Area Signs

Pool, fitness center, leasing office, mail room, and package-area signs were coordinated with the property brand while meeting applicable accessibility requirements. Learn more about ADA signage and compliance.

How Did a Coordinated Signage Scope Help?

Managing the work as one package gave the general contractor a single sign schedule, one approval process, and one installation team. That reduced trade coordination and helped keep permanent-room, directory, parking, and amenity signage aligned before inspection.

Multifamily Signage FAQ

Signage planning should begin while finish selections and room schedules are still being finalized. Early coordination gives the project team time to confirm sign locations, accessibility requirements, brand finishes, production lead times, and installation sequencing before the inspection deadline.
Yes. Powell’s can coordinate colors, typography, materials, and directory finishes with the property’s design standards while maintaining the contrast, tactile, Braille, and mounting requirements that apply to regulated signs.
Yes. Powell’s supports general contractors with sign schedules, submittals, field verification, production coordination, and installation planning for multifamily, commercial, public works, and tenant-improvement projects.